Before you start
Costs must be on for the team. The menu entry needs costs.manage. Cost centres are set up in Partners and costs.
Steps
- Open Chargebacks. The list shows each month with its status (Draft or Locked), the cost centres, the total, and when it was computed.
- Choose a Month. It cannot be later than this month. Run it.
- Open the statement. It shows Charged out, Cost centres, and Shipments. Each cost centre row shows shipments, share, ton-km, and amount. Expand a row to see vehicles and a Trip link.
- Click Export CSV to download the lines.
- Lock the month when it is final.
Rules and limits
- Locking is final: "The figures stay as they are now and cannot be run again or changed. This cannot be undone."
- A warning says "N lines belong to a cost centre that is not listed". Those lines stay in the CSV.