DocsGet started
Documentation

How Build works with other apps

Build needs Hovera Logistics. Other apps are optional.

  • Logistics: material and finished goods are Logistics stock. Only Logistics posts stock. Build asks Logistics to post and shows the result. Releasing an order sends one part request and reserves stock. See Stock and counts.
  • Maintenance: machines can be Maintenance equipment. A machine-down report can open an issue. See Maintenance.
  • Qualifications and calendars: used for who may work and when. See People, partners, and costs.
  • Costs: with costs on, planned cost is set at release. Actual cost is material at average cost plus labour minutes at the work-centre rate plus overhead per work-centre hour. Unit cost is the total divided by good quantity.

A defence install uses these words: job order (production order), technician (operator), deficiency report (non-conformance report), workshop (plant).

Limits

Build has no AI. Every proposal names its rule. Build is not a regulated record system: it has no electronic signatures. Station actions are retried until the server answers.